UGCC specializes in the design, construction and maintenance of major highways/motorways, complex bridges, viaducts, and tunnels, in addition to suburban roads and related infrastructure.
Our capabilities are reinforced by one of the largest privately-owned fleets of construction plant and equipment in the Middle East, which enables rapid mobilization of the necessary resources for any project.
Experienced Engineers
Skilled Workers
Latest Equipment
Asphalt Plants
Central Testing Laboratory
For bridges, our successful track-record includes the design and construction of pre-stressed precast concrete girder, segmental, post-tensioned concrete, and balanced-cantilever bridges.
For roadways, UGCC leads the way in technology and innovation to improve and optimize quality of pavements, traffic safety, and construction phasing to reduce traffic congestion. Having successfully implemented the development and upgrading of major roadway systems under the most challenging conditions, our experience encompasses projects of varying magnitudes and difficulties.
As the largest producer of Hot Mix Asphalt in the State of Kuwait, UGCC has the ability to produce and pave more than 2,000,000 metric tons of asphalt annually, in accordance with the most stringent International standards and best practices.
Project |
Country |
Value |
| RA/259 – Construction, Completion and Maintenance of the Road and Interchanges on the Existing 6th Ring Road to Interchange 82 (Ongoing Project) | Kuwait | USD 494M |
| RA/245 – Construction, Upgrading and Maintenance of Roads and Interchanges for Access to the Future Mutla’ City (Ongoing Project) | Kuwait | USD 358 M |
| RA/200 ( R ) – Construction and Maintenance of Roads, Bridges, Storm Water Drainage, Sewer and Other Services for Cairo Street (Ongoing Project) | Kuwait | USD 348 M |
| RA/223 – Construction, Completion and Maintenance of 6.5 Ring Road (Ongoing Project) | Kuwait | USD 320 M |
| RA/126 – Roads, Bridges, Rainwater Drainages, Sanitary and Other Services for Subiya Highway – 3rd Phase | Kuwait | USD 136.1 M |
| Construction of Eight lane access Controlled Expressway as Outer Ring Road to Hyderabad City | India | USD 27.4 M |
| RA/DEV/14/13 – Construction of Zomba (Ndege)-Jali-Phalombe-Chitakale Road in Malawi, Africa | Malawi | USD 12 M |
DO YOU WANT TO KNOW MORE?
Take A Look At The Projects That Have Helped Us Grow Over The Years