loader
Our business lines

Micro-tunneling

United Gulf Construction Company has international experience in installing pipelines at various locations with the Micro-tunnelling process

introduction

UGCC has international experience in installing pipelines at various locations with the Micro-tunnelling process.

UGCC’s specialized teams can accommodate works requiring shaft sinking of pipes ranging in diameter from 250mm to 2400mm, and shaft sinking up to a depth of 30m. This service is required for projects ranging from civil infrastructure and sewage to electro-mechanical works and also for various construction requirements within the oil industry. This allows the work crew to divert existing utilities mains without lengthy service interruptions.

  • Micro-tunneling

  • Pipelines range - 250mm dia. to 2400mm dia.

  • Depth - up to 30m

Relative Experience

Project
Country
Value
Construction, Operation and Maintenance of New Mishrif Pump Station, Force Mains and Subhan, South Surra and Fahaheel Interceptors. SE/19 Kuwait USD 152M
A’Seeb Sewage Collection and Conveyance System – Al Khoudh Gravity Sewer Network. Contract 5A (HAYA/E024/2009) Oman USD 151M
Installation of Pipelines (Duplicate A-Main/Trenchless Technology) at Various Locations in Hyderabad. 31/DBI/CGM(E)/PCC-I/1800mm India USD 10.7M

Drag
01 / 0
Business Lines
Next
Roads and Bridges